Introduction  Top

Pine Brook Corporation is a general contractor, design builder, and construction manager based in Kittery, ME. We target high profile, fast track, high risk projects because we have the focus, ability, and control to do them well and receive the highest references from all of our customers, architects and engineers.
Pine Brook Corporation’s basic business principles of genuine honesty and integrity set our firm apart. Couple this concept with our planning, problem solving and project management skills and it isn’t difficult to understand how we consistently exceed our customers’ expectations across the board. In this manner, we have created a base of repeat customers of which we are extremely proud to boast.

We encourage you to review our projects and to contact our references.

Philosophy of Business Top

Pine Brook Corporation’s philosophy of business as a General Contractor, Construction Manager or Design Builder is essentially the same.  We protect and serve the owner and architect by utilizing the same conservative principles we use to protect our own interests.
Again, please confirm with our references.

  • Prequalification of subcontractors ensures balance of price, ability and stability.


  • Subcontractors and suppliers are kept on an even playing field by identifying, in great detail, the scope of work on which they are bidding.


  • Time is money, therefore stringent schedules are set and various timely methods are used continuously to ensure the project remains on track.


  • Value engineering is consistently/continuously applied across the project to pin point possible areas of improvement/owner savings.


  • Requests for change orders are closely analyzed to ensure applicable cost savings have been included and actual costs to subcontractors are reflected in their pricing.


  • Consistent prompt payment of subcontractors / suppliers buys the owner best pricing.

No matter the construction process, Pine Brook Corporation both understands and accepts our fiduciary responsibility to our clients and subcontractors.

Project Objectives Top

  • Create unified “team work” environment among owner, architect, engineers, Pine Brook Corp., subcontractors & suppliers at both administrative and field levels.

  • Develop, monitor, and maintain/improve aggressive schedule.

  • Participate fully in the value engineering process.

  • Limit liability exposure by ensuring the safest possible working environment by utilizing our safety consultant for periodic OSHA compliance review.

  • Ensure all work put in place adheres to strict tolerances.

  • Receive highest possible review from the owner and architect.

  • Provide the owner with a finished product that will stand the test of time.

Pine Brook Corporation Lead Personnel  Top

  • Richard D. Johnson, Project Manager/Site Supervisor

  • David Ranta, Project Manager/Site Supervisor

  • Crystal Wilson, Project Manager/Administrative Assistant

  • Mike Cloutier, Project Manager/Site Supervisor

  • Linda Nelson, Assistant Project Manager/Office Manager

  • Charles Gary, Site Supervisor/Carpenter Foreman

  • Steven Allen, Site Supervisor/Carpenter Foreman

  • Jamie Corriveau, Carpenter Foreman

Example of Management Plan for Construction Management  Top

Pre-Construction

  • Pine Brook Corp. plan/spec review and initial schedule of administrative and construction processes.

  • Begin weekly meetings with owner and architect.

  • Make bid documents and detailed scopes of work available to subcontractors.  Include request for value engineering ideas.

  • Establish bid date for subcontractors.

  • Identification of general conditions and misc. costs.

  • Receive and review subcontractor bids.

  • Develop/review value engineering options and present viable options to architect/owner for approval.

  • Completion of “GMP” budget.

  • Award subcontracts (To review a sample contract please contact us).

  • Preconstruction Conference #1

  • Subcontractors added to weekly meetings.

  • Submittal process.

  • Release long lead materials to be ordered and stored off site.

  • Release short lead materials to be ordered and stored off site.

  • Schedule finalization and subcontractor sign-off on final schedule.

  • Preconstruction Conference #2

Construction

  • Continue weekly meetings with all parties in attendance.

  • Perform +/- 4 daily site inspection to ensure quality control is maintained and schedule is coordinated.

  • Hold weekly meetings between CM and subcontractor foremen to discuss previous/current/upcoming weeks’ issues.

  • Hold weekly meetings between CM and all field personnel to discuss previous/current/upcoming weeks’ issues.

  • Provide incentives/perks to field personnel to create and maintain the “team work” environment and keep production levels high.

  • Implement techniques to ensure meeting completion date including, but not limited to, additional field personnel work hours and additional subcontractors.

  • Process legitimate change orders quickly (See Change Orders).

  • Close out contract including punchlist, as builts and O & M’s on time.

Pine Brook Corporation’s Role as a Construction Entity Top

  • Bring technical, fast track scheduling and subcontractor control experience to the project.

  • Provide viable value engineering options to owner/architect for consideration.

  • Bring a large network of proven subcontractors to the project.

  • Establish and bolster the “team work” environment.

  • Offer the option of in house demolition, carpentry, masonry, steel, and concrete work.

  • Recognize and adhere to budget amounts.

  • Act as mediator between owner/architect and subcontractors on any change order disputes and expedite all change orders to avoid construction delays.

  • Defend the best interests of the owner/architect throughout the project.

  • Develop and maintain/improve aggressive schedule.

  • Maintain high standard of quality control from structural framing through final finish work.

Change Orders Top

  • Identify potential credits due to owner to offset potential charges from subs.

  • Verify subcontractor actual costs prior to mark-up.

  • Expedite technical resolutions, if required, and proposals.

  • If acceptable to owner/architect, proceed on confirmed verbal direction by issuing written change orders to subcontractors and notifying owner/architect of same.

Quality Control Top

  • Anticipate QC issues in advance and discuss at weekly subcontractor meetings.

  • Identify/develop work tolerances.

  • Constantly monitor daily work in progress.

  • Coordinate testing agencies.

Surety  Top

Pine Brook Corporation’s bonding program is provided by the Insurance Company of North America through Bill VerPlanck of the Rowley Agency (22 year relationship).

Our current single job limit is approximately 10 million dollars.  Bonding Letter of Surety

Safety Top

Our number one priority is providing the safest possible work environment for all crews in the field.  Not only are our supervisors trained in OSHA compliance, but we also contract with Contractors Risk Management to conduct regular unannounced inspections of all job sites.

Any site receiving a score less than 8 out of 10 is automatically scheduled for a follow-up surprise inspection. Subcontractors in violation during the original failed inspection are required to rectify the violation immediately, assessed a fine per our “Subcontractor Fine System”, and charged a portion of the re-inspection fee.

 

General Contractors  * Construction Managers  *  Design Builders
 
Pine Brook Corporation — Contact Information

EMAIL PBC@pinebrookcorp.com
PHONE In the US please call 207-439-7547, or in NH 603-430-9880
FAX 207-439-8556

Privacy Policy |  Terms of Use |  Contact Us
© 2004 Pine Brook Corporation. All Rights Reserved